Landscaping
How to Bid Landscaping Jobs: A Step-by-Step Guide for Small Crews
To bid a landscaping job, measure the areas involved, break the work into tasks, estimate labor hours for each using your crew's production rates, add materials with markup, include equipment, delivery and disposal, apply your overhead and profit, and present it as a clear proposal. Most landscaping bids that lose money miss one of three things: access, disposal or material markup.
Step 1: Measure and document the site
Record square footage of beds and lawn, linear feet of edging, the number and size of plants to remove or install, slopes and access width for machines. Photos of every area help you remember details later, and let you bid small jobs without a visit. See how to estimate a job from photos.
Step 2: Break the job into tasks
For example: remove old shrubs, regrade beds, install edging, plant 12 shrubs, spread 6 yards of mulch, clean up. Each task has its own production rate.
Step 3: Estimate labor hours
Use your own history. How long does your crew take to spread a yard of mulch, plant a 3-gallon shrub, or install 100 feet of edging? Multiply by crew size and your burdened labor rate. Add travel and setup time. See labor burden rate.
Step 4: Price materials with markup
Quantity every material: cubic yards of mulch, soil or stone; plant counts by size; edging, fabric and stakes. Add your markup; materials involve buying, hauling and warranty risk. See mulch installation cost per yard and markup vs margin.
Step 5: Equipment, delivery and disposal
Include machine time or rental, delivery fees, and dump fees for green waste, soil and debris. These are the most common silent losses on landscaping bids.
Step 6: Overhead and profit
Add your overhead recovery and profit margin. Check the result against what similar jobs have sold for. See average contractor profit margin by trade.
Step 7: Present the bid
Show scope in plain language, options (for example, mulch refresh only vs full bed renovation), timeline, warranty on plants, and payment terms. Faster is better: Fast Snap Pro builds an itemized landscaping estimate from customer photos using your price book, so smaller bids go out the same day. See also the landscaping estimate template and landscaping estimating software.
Example: labor math for a mulch job
If your two-person crew installs about 1.5 cubic yards of mulch per crew-hour including edging touch-ups, and your burdened crew rate is $110 per hour:
| Line item | How it's priced | Example |
|---|---|---|
| Mulch material (8 cu yd) | Cost + markup | $400 |
| Install labor (8 ÷ 1.5 ≈ 5.3 crew-hrs) | Crew-hours × $110 | $587 |
| Delivery | Supplier fee | $75 |
| Weeding and bed prep (2 crew-hrs) | Crew-hours × $110 | $220 |
| Travel and setup (0.75 crew-hr) | Crew-hours × $110 | $83 |
| Total | $1,365 |
Illustrative numbers only. Use your own rates, production times and local costs.
Frequently asked questions
How do landscapers calculate labor costs?
By estimating hours per task from their production history, multiplying by crew size and a burdened hourly rate that includes taxes, insurance and benefits.
What should a landscaping bid include?
Scope by area, materials and quantities, labor, equipment, disposal, timeline, plant warranty, total price and payment terms.
How do I bid a commercial landscaping contract?
Price per visit or per month from measured areas and service frequency, add seasonal services separately, and include contract length and terms.
See what an AI-scoped estimate looks like
Send a link, get photos back with a priced estimate — using your own rates, not a generic price book.
Try Fast Snap Pro freeGuides for landscaping
- Landscaping Estimating Software: How to Quote Faster and Protect Your Margin
- Lawn Care Pricing Guide: What to Charge for Mowing and Maintenance
- Photo-to-estimate app for contractors
Related guides
- How to Price Tree Service Jobs: Removal, Trimming and Stump Grinding
- Landscaping Estimate Template: What to Include (and How to Send It Fast)
- How to Price Pressure Washing Jobs: Per Square Foot, Minimums and Add-Ons
- How to Price Drywall Jobs: Hanging, Finishing and Repairs
- How to Price HVAC Jobs: Flat-Rate Repairs, Replacements and Maintenance